Just got a call this morning. The guys who are going to put up our house called.........
They are going to be here on the 22nd! Sounds like everything is going to be delievered that day!!!!!
The log home company is already pre-cutting our logs.
Digger is going to be here tomorrow.
Hubby is on the phone with the concrete guy. He is suppose to be here on the 15th. Has 6 foundations in front of us. Said the time line is pushing it. One woman cannot make up her mind. Might by pass them and come get us done. No changes in our floor plan except for 2 interior walls which are simple fixes. changed from a 2"x4" wall to a 2"x6" stud framing for exhaust for the furnance and water heater.
Still have to drop that over head power line. Found the underground one and it is marked.
Thought they were going to be here the first of August. Turns out the building crew has be down in Kansas after our house is up. they are pretty busy.
Still trying to hay. :drink: :drink:
They are going to be here on the 22nd! Sounds like everything is going to be delievered that day!!!!!
The log home company is already pre-cutting our logs.
Digger is going to be here tomorrow.
Hubby is on the phone with the concrete guy. He is suppose to be here on the 15th. Has 6 foundations in front of us. Said the time line is pushing it. One woman cannot make up her mind. Might by pass them and come get us done. No changes in our floor plan except for 2 interior walls which are simple fixes. changed from a 2"x4" wall to a 2"x6" stud framing for exhaust for the furnance and water heater.
Still have to drop that over head power line. Found the underground one and it is marked.
Thought they were going to be here the first of August. Turns out the building crew has be down in Kansas after our house is up. they are pretty busy.
Still trying to hay. :drink: :drink: