Sometimes power companies have rules/codes that are ridiculous.
I have an older house in town that is 65 years old and had an old style meter. When I re-roofed it I had KCP&L come out to disconnect the power. I was going to update with new meter can.
When they came out they disconnected the wire from the meter (still hot) and wrapped black tape around the end and tied it to a tree about 8' from the house.
When I asked them about burying the line I couldn't believe the answer. The pole the transformer was on was 28' from the meter. They were going to charge me $750 to hook the wire to the transformer. They were going to replace the wire anyway, and they would have to climb the pole and connect that wire also.
I had to dig the trench, bury the 2" conduit I had to buy, pull the string through it and have the sweep on both ends.
None of my trenchers would fit back there, so it was going to be a hand dig project. But they convinced me to just let it be!
I put the weatherhead up and let them fix it if the limb fall on it!