I had a guy do some repairs on my road. We have had close to 30" of rain in the last 60 days. I had more slop than a road. he was going to haul in some shale and spread it out. well after getting the dozer stuck several times, pushing up mud in the middle of my working pens, and about 20 loads of big washed rock his $800 quote turned into a $4600 bill. that;s not the worst of it. He scraped the slop off the top and put the rock down which just sank in the new mud. It is far worse than before and the mud that is pushed in fornt of my pens has left them inaccesiable. he can't push the mud because of the mess he made pushing it where it is now. to make a long story short, make sure the people you hire know what they are doing. any tips on road improvment