Engineering Quiz (pics)

Help Support CattleToday:

txag

Well-known member
Joined
Dec 23, 2003
Messages
1,712
Reaction score
0
Location
Texas
A Backhoe weighing 8 tons is on top of a flatbed trailer and heading east on Interstate 70 near Hays, Kansas. The extended shovel arm is made of hardened refined steel and the approaching overpass is made of commercial-grade concrete, reinforced with 1 1/2 inch steel rebar spaced at 6 inch intervals in a crisscross pattern layered at 1 foot vertical spacing.

Solve: When the shovel arm hits the overpass, how fast do you have to be going to slice the bridge in half? (Assume no effect for headwind and no breaking by the driver...)

Extra Credit: Solve for the time and distance required for the entire rig to come to a complete stop after hitting the overpass at the speed calculated above.












top.jpg


center.jpg


bottom.jpg


http://www.equipmentworld.com/apps/news ... p?id=52814
 
You know I could understand if the boom was just a LITTLE too long, but that puppy is sticking up 10-12' over the bridge. It really makes you wonder how safe your family is out on the roads with people like this idiot driving. 25 tons of rolling energy mind you!
 

Latest posts

Top