Unfortunately I can't. The water comes from the topside and drains across be into a swampy area on the bottom side! I'm kinda stuck in the middle I guess.littletom":b3ocwxrn said:Can you not dump it in the brush on either side instead of all the way through the good ground? Some local guys I know did a whole farm couple years ago. They said it cost 900 a acre, but it was all done with a gps by professional tile company. Friend of mine did a 30 acre bottom last year himself, he owns a ditch witch. Not sure what he spent both are happy.
I know nothing about Alabama ground or local conditions, common local practices ect. but...southernultrablack":2cfek1uc said:
SOB, 6" tile was an option. I think it increased price from 1.35 to 1.50-1.65. This will be installed with a gps guided tile plow. I may have to give the 6" tile more consideration since I'm only doing one run.Son of Butch":2whq20u2 said:I know nothing about Alabama ground or local conditions, common local practices ect. but...southernultrablack":2whq20u2 said:
How much more would it cost to go with 6" tile?
We used 6" and 8" and wished we had gone 8" in a couple more areas than we did.
But I'm sure we are talking totally different situations here with longer and deeper runs.